Labeling
Systems: Design, Development and Delivery
With over 12 years of experience in delivering turnkey labeling systems, we are experts at avoiding pitfalls that occur when designing and installing a new system. Typical phases include:
- Phase 0 = Develop project justification and specifications
- Phase 1 = Specifications and design concurrence
- Phase 2 = Design and test software and hardware
- Phase 3 = Install system at your site and conduct pilot production
- Phase 4 = Production run and sign off
Typical turnkey systems include:
Design / Re-design label formats to use a database
Design and Development of labeling system All hardware/ software configured, tested & debugged using actual label stock
On-Site installation, debug & training for operators, trainers and maintenance personnel
Cost Reduction Engineering
Take advantage of on site walk-through to analyze potential cost savings that can be realized through the addition, modification, or redesign of bar code / product labeling & other systems. See Client Success stories tab.
Database Development
We design, develop and maintain databases. By utilizing the capabilities of Microsoft Access, we are able to provide our customers with very powerful tools for reporting, data entry and automated data manipulation.
The complexity of a labeling system is also greatly reduced by using a well-designed database. Data entry can be automated so that data entry errors are virtually a thing of the past. Customized data entry forms and custom report menus are readily available. |